1
answer
0
watching
328
views
4 Jan 2019

E4-12 Assigning Costs Using Traditional System, ABC System [LO4-1, 4-3, 4-4, 4-5, 4-6] Bunker makes two types of briefcase,fabric and leather. The company is currently using a traditionalcosting system with labor hours as the cost driver but isconsidering switching to an activity-based costing system. Inpreparation for the possible switch, Bunker has identified twoactivity cost pools: materials handling and setup. Pertinent datafollow:

Fabric Case Leather Case
Number of laborhours 15,000 9,000
Number of materialmoves 440 660
Number ofsetups 40 80

Total estimated overhead costs are $150,000, of which $110,000is assigned to the materials handling cost pool and $40,000 isassigned to the setup cost pool.

Required:
1.

Calculate the overhead assigned to the fabric case using thetraditional costing system based on direct labor hours. (Donot round intermediate calculations and round your final answer tothe nearest whole dollar amount.)

OverheadAssigned ?
2.

Calculate the overhead assigned to the fabric case using ABC.(Round activity rates or activity proportions to fourdecimal placesand round your final answer to 2decimal place.)

Overhead Assigned ?

3. Was the fabric case over- orundercosted by the traditional cost system compared to ABC?
FabricCase ?
?

For unlimited access to Homework Help, a Homework+ subscription is required.

Bunny Greenfelder
Bunny GreenfelderLv2
6 Jan 2019

Unlock all answers

Get 1 free homework help answer.
Already have an account? Log in

Related questions

Related Documents

Weekly leaderboard

Start filling in the gaps now
Log in