Bunker makes two types of briefcase, fabric and leather. Thecompany is currently using a traditional costing system with laborhours as the cost driver but is considering switching to anactivity-based costing system. In preparation for the possibleswitch, Bunker has identified two activity cost pools: materialshandling and setup. Pertinent data follow:

Fabric Case Leather Case
Number of laborhours 17,000 11,000
Number of materialmoves 560 1,040
Number ofsetups 35 135

Total estimated overhead costs are $249,800, of which $192,000is assigned to the materials handling cost pool and $57,800 isassigned to the setup cost pool.

Required:
1.

Calculate the overhead assigned to the fabric case using thetraditional costing system based on direct labor hours. (Donot round intermediate calculations.)

Overhead assigned:

2.

Calculate the overhead assigned to the fabric case usingABC.

Overhead assigned:

3. Was the fabric case over- orundercosted by the traditional cost system compared to ABC?
Fabric case:

For unlimited access to Homework Help, a Homework+ subscription is required.

Lelia Lubowitz
Lelia LubowitzLv2
28 Sep 2019

Unlock all answers

Get 1 free homework help answer.
Already have an account? Log in

Related questions

Weekly leaderboard

Start filling in the gaps now
Log in