1
answer
0
watching
459
views
limeraven352Lv1
28 Sep 2019
Two-Stage ABC for Manufacturing
Detroit Foundry, a large manufacturer of heavy equipmentcomponents, has determined the following activity cost pools andcost driver levels for the year:
Activity Cost Pool Activity Cost Activity Cost Driver
Machine setup $672,000 12,000 setup hours
Material handling 192,000 2,000 materialmoves
Machine operation 500,000 10,000 machine hours
The following data are for the production of single batches oftwo products, C23 Cams and U2 Shafts during the month ofAugust:
C23 Cams U2 Shafts Units produced 500 300 Machine hours 4 5 Direct labor hours 200 400 Direct labor cost $11,000 $16,000 Direct materials cost $36,000 $26,000 Tons of materials 13 8 Setup hours 3 7
Determine the unit costs of C23 Cams and U2 Shafts usingABC.
Round cost per gallon to two decimal places.
Product Costs C23 Cams U2 Shafts Direct materials $Answer $Answer Direct labor Answer Answer Manufacturing overhead: Machine setups Answer Answer Material handling Answer Answer Machine operation Answer Answer Total job costs $Answer $Answer Units produced Answer Answer Cost per unit produced $Answer $Answer
Two-Stage ABC for Manufacturing
Detroit Foundry, a large manufacturer of heavy equipmentcomponents, has determined the following activity cost pools andcost driver levels for the year:
Activity Cost Pool | Activity Cost | Activity Cost Driver | |
---|---|---|---|
Machine setup | $672,000 | 12,000 setup hours | |
Material handling | 192,000 | 2,000 materialmoves | |
Machine operation | 500,000 | 10,000 machine hours |
The following data are for the production of single batches oftwo products, C23 Cams and U2 Shafts during the month ofAugust:
C23 Cams | U2 Shafts | |
---|---|---|
Units produced | 500 | 300 |
Machine hours | 4 | 5 |
Direct labor hours | 200 | 400 |
Direct labor cost | $11,000 | $16,000 |
Direct materials cost | $36,000 | $26,000 |
Tons of materials | 13 | 8 |
Setup hours | 3 | 7 |
Determine the unit costs of C23 Cams and U2 Shafts usingABC.
Round cost per gallon to two decimal places.
Product Costs | ||
---|---|---|
C23 Cams | U2 Shafts | |
Direct materials | $Answer | $Answer |
Direct labor | Answer | Answer |
Manufacturing overhead: | ||
Machine setups | Answer | Answer |
Material handling | Answer | Answer |
Machine operation | Answer | Answer |
Total job costs | $Answer | $Answer |
Units produced | Answer | Answer |
Cost per unit produced | $Answer | $Answer |
Casey DurganLv2
28 Sep 2019