OMIS 2010- Midterm Exam Guide - Comprehensive Notes for the exam ( 25 pages long!)
Document Summary
Omis 2010 assignment b1 winter 2017. Groups can not consist of students from other sections of the course: only one person uploads the assignment, adding all names on the file. The files names should be of the form: a2_lastname1_lastname2_lastname3. xlsx . Group can be minimum of 2 members and maximum of 3 members. The concert touring inc. company signed a contract with a rock band to arrange a concert tour across canada. The company identified the following activities that need to be completed before the tour can begin. The times of activities are given in weeks. The designer of the poster and tickets (activity e) guarantees to complete her work in exactly. Assuming that each activity will last as expected, determine if concert touring inc. should spent the additional ,000 and secure a 1-week length for activity e to speed up the project. Norton industries is installing a new computer system.