PETE 1010 Chapter : Drilling With Blanks

11 views44 pages
15 Mar 2019
School
Course
Professor

Document Summary

3 case studies: know who was involved, what happened, consequences, why it was unethical. _________- the contractors top manager on the drill site, responsible for rigs overall operations and performance. Makes sure the crew drills the well to the operators specifications. Sometimes referred to as the rig super intendant or rig manager. _________- subornment only to the tool pusher and is the person who operates the drilling machinery. Also manages the day to day activities of the derrick hand and rotary helpers. Looks after the mud pumps and sometimes monitors and records the condition of the mud. When drill pipe is removed or put into the well, they handle the pipe from a platform on top the derrick. ________- (roughnecks, floor hands) handle the bottom of the pipe on the rig floor when pipe is removed or added. At other times they maintain and repair the tools and equipment on a rig.

Get access

Grade+
$40 USD/m
Billed monthly
Grade+
Homework Help
Study Guides
Textbook Solutions
Class Notes
Textbook Notes
Booster Class
10 Verified Answers
Class+
$30 USD/m
Billed monthly
Class+
Homework Help
Study Guides
Textbook Solutions
Class Notes
Textbook Notes
Booster Class
7 Verified Answers

Related Documents