FIN 401 Study Guide - Final Guide: Exchange Rate, Federazione Industria Musicale Italiana, Upper And Lower Bounds

183 views5 pages
10 Dec 2015
Department
Course
Professor

Document Summary

Capital budgeting (npv) the difference between the market value of a project and its cost. Payback period how long does it take to get initial cost back (put interest as. 0% in calc) [discount pb = use r] Mirr used for non-conventional cfs (irr can"t handle) Method 1: discount approach: all ve cfs are discounted back to present and added to initial cost. Method 2: reinvestment: all cf except the first are compounded (fv) at end of proj. "s life. For eac = find pmt once npv is solved and choose lower cost. Method 3: combo: all ve cfs are discounted back to present and all +ve cfs are compounded at end (d +k )[ 1+0 . Npv: pv (ocf) + pv (ncs) + pv (nwc) + pvccats. Ocf: (s-c)(1-tc) (you will get pmt then input in calc to. Ncs: - initial cost + pv (salvage)