1
answer
0
watching
339
views
6 Oct 2020
A snowmobile is pulling a sled (m =375 kg) across the snowy tundra (Fig. P9.79). The snowmobile applies a pulling force of 2511 N at an angle of 15˚ with respect to the ground and pulls the sled over a distance of 50.0 m.
(a) How much work is done by the snowmobile?
(b) IF the sled is also being acted on by a constant kinetic friction of 255 N and it started from res, what is the final speed of the sled?
A snowmobile is pulling a sled (m =375 kg) across the snowy tundra (Fig. P9.79). The snowmobile applies a pulling force of 2511 N at an angle of 15˚ with respect to the ground and pulls the sled over a distance of 50.0 m.
(a) How much work is done by the snowmobile?
(b) IF the sled is also being acted on by a constant kinetic friction of 255 N and it started from res, what is the final speed of the sled?
KathLv10
23 Nov 2020