2
answers
0
watching
185
views
23 Nov 2019
A man lifts a 20.0-kg bucket of concrete from the ground up to the top of a 30.0-m tall building. The bucket is initially at rest, but is traveling at 4.0 m/s when it reaches the top of the building. How much work was done by the man in lifting the bucket?
A man lifts a 20.0-kg bucket of concrete from the ground up to the top of a 30.0-m tall building. The bucket is initially at rest, but is traveling at 4.0 m/s when it reaches the top of the building. How much work was done by the man in lifting the bucket?
nisar00087Lv7
3 Feb 2024
Jean KeelingLv2
12 Jun 2019
Already have an account? Log in