1
answer
0
watching
343
views

Standard Product Cost

Hickory Furniture Company manufactures unfinished oak furniture.Hickory uses a standard cost system. The direct labor, directmaterials, and factory overhead standards for an unfinished diningroom table are as follows:

Direct labor: standard rate $19 per hr.
standard time per unit 2.5 hrs.
Direct materials (oak): standard price $9.5 per bd. ft.
standard quantity 19 bd. ft.
Variable factory overhead: standard rate $2.8 per direct labor hr.
Fixed factory overhead: standard rate $1.2 per direct labor hr.

a. Determine the standard cost per dining roomtable. If required, round your answer to two decimal places.
$per table

b. A standard cost system provides HickoryFurniture management a cost control tool using the principle of .Using this principle, cost deviations from standards can beinvestigated and corrected.

For unlimited access to Homework Help, a Homework+ subscription is required.

Nestor Rutherford
Nestor RutherfordLv2
28 Sep 2019

Unlock all answers

Get 1 free homework help answer.
Already have an account? Log in

Weekly leaderboard

Start filling in the gaps now
Log in