1
answer
0
watching
152
views

Pharoah Co. purchased land as a factory site for $432,000. The process of tearing down two old buildings on the site and constructing the factory required 6 months. The company paid $45,360 to raze the old buildings and sold salvaged lumber and brick for $6,804. Legal fees of $1,998 were paid for title investigation and drawing the purchase contract. Pharoah paid $2,376 to an engineering firm for a land survey, and $73,440 for drawing the factory plans. The land survey had to be made before definitive plans could be drawn. Title insurance on the property cost $1,620, and a liability insurance premium paid during construction was $972. The contractor’s charge for construction was $2,959,200. The company paid the contractor in two installments: $1,296,000 at the end of 3 months and $1,663,200 upon completion. Interest costs of $183,600 were incurred to finance the construction. Determine the cost of the land and the cost of the building as they should be recorded on the books of Pharoah Co. Assume that the land survey was for the building. Cost of the Land $ Cost of the Building $

For unlimited access to Homework Help, a Homework+ subscription is required.

Jamar Ferry
Jamar FerryLv2
28 Sep 2019

Unlock all answers

Get 1 free homework help answer.
Already have an account? Log in
Start filling in the gaps now
Log in