MGMT-6056 Lecture 9: module 9

9 views4 pages
31 May 2022
Course
Professor

Document Summary

The red triangle is called the triple constraint. Resource management is a separate knowledge area (9)from project schedule. Management (6), but process 9. 2 has a direct impact on the project schedule and costs. To determine the resource requirements so that they will be available at the right time. To allow each activity to be scheduled with the smoothest possible transition across resource usage levels. These resource optimization terms are frequently used interchangeably, but technically the. Resource smoothing adjusting dates using only available float to meet predefined resource limits, the critical path is not changed, the project cannot get longer and therefore not all resource limits may be met. Resource leveling - adjusting activity dates to meet resource constraints or keep resources at a constant level. Available float is used for leveling resources and the critical path may change (the project duration may get longer).

Get access

Grade+20% off
$8 USD/m$10 USD/m
Billed $96 USD annually
Grade+
Homework Help
Study Guides
Textbook Solutions
Class Notes
Textbook Notes
Booster Class
40 Verified Answers
Class+
$8 USD/m
Billed $96 USD annually
Class+
Homework Help
Study Guides
Textbook Solutions
Class Notes
Textbook Notes
Booster Class
30 Verified Answers

Related Documents

Related Questions