ENSC 201 Lecture Notes - Lecture 22: Landfill Gas, Geomembrane, Polychlorinated Biphenyl

27 views6 pages

Document Summary

Canadians generate 35 million tonnes per year. Old dumps (of the past) sited at location of convenience (i. e old worked out sand or gravel pits, a hole in the ground love canal) No control of waste (solid, liquid hazardous and non-hazardous) little or no engineered operations. Need for proper site and suitability assessment. Need for proper operations, maintenance and monitoring. Need to control development in buffer zones (even in remote areas) and landfill after-use. These risks need to be evaluated in comparison with the risks and environmental impacts of alternative means of disposal. May look simple, but landfills and barrier systems for landfills are very complex systems. Watch for cost conscious" proponents not being prepared to do it right". Keep up to date as waste streams and needs change so too must regulations and designs. Regulators having the time and training to regulate correctly. Lack of understanding by people of what is required and involved.

Get access

Grade+
$40 USD/m
Billed monthly
Grade+
Homework Help
Study Guides
Textbook Solutions
Class Notes
Textbook Notes
Booster Class
10 Verified Answers
Class+
$30 USD/m
Billed monthly
Class+
Homework Help
Study Guides
Textbook Solutions
Class Notes
Textbook Notes
Booster Class
7 Verified Answers

Related Documents